A detailed evaluation of the convenience
and feasibility of providing the amenities in your apartment is
carried out by architects, engineers and electrical, civil and sanitary
contractors. They are designed for maximum utility and convenience.
You may still wish to modify designs or to install additional equipment
and fittings. The following information will be useful when you
are placing requests for extra works:
It is our objective to deliver the
project on schedule.
This objective can be met only if we plan all items of work well
in advance. We request your co-operation in finalising the requirements
for your flat early to enable us to proceed speedily with the work.
Subject to feasibility, the following is a summary of the jobs which
can normally be accepted:
|
| |
Electrical
|
|
 |
|
|
|
 |
| |
Energising all dummy points |
 |
|
 |
Providing extra electrical points at different
levels and posotions |
Shifting electrical points |
Provision for Air Conditioners |
 |
|
|
 |
 |
| |
Plumbing |
|
| |
 |
|
|
 |
| |
 |
Providingadditional inlet and outlet(wall or floor
drain) for washing machine. |
 |
Providing inlet for aqua guard. |
Providing inlet and outlet for dish washer. |
Providing inlet for health faucets. |
 |
Providing flush tank in servants toilet. |
 |
Providing bath-tubs, (as per feasibility and
item supplied by client). |
 |
Providing hand/telephonic showers in toilets. |
 |
Providing hot and cold water connections to wash
basins. |
 |
Change of sanitary wares, like wash basins and
EWC’s. |
 |
Change of tiles in toilets. |
 |
Providing marble/granite sinks in work area. |
 |
Providing tiles in work area. Extra height of
tiles on the walls. |
 |
Providing kitchen sinks of any size in the kitchen
(subject to feasibility). |
 |
Providing swan neck or swivel type taps for kitchen
sink. |
 |
Providing full pedestals or half pedestals for
wash basins. |
 |
Providing aluminium sliding partitions for shower
area in toilets. |
 |
Providing shower curtain rods in toilets. |
 |
Providing paper holders in toilet. |
|
|
|
 |
| |
 |
| |
 |
|
 |
 |
|
|
| |
Civil Works |
|
| |
 |
|
|
 |
| |
 |
Demolishing walls to combine rooms. |
 |
Converting toilets to a utility room. |
 |
Converting toilets to dress area (False ceilings
are provided when a room is below a toilet). |
 |
Combining bedroom balconies by demolishing the
partition wall. |
 |
Providing extra counters. |
 |
Extending kitchen counters by avoiding the store
room. |
 |
Air Conditioner frames with grills and glasses. |
 |
Change of flooring. |
 |
Converting store room to
puja room. |
 |
Providing cornices. |
 |
Providing wash basin counters in toilets (subject
to feasibility). |
 |
Providing raised ridges in shower areas. |
 |
Providing a gap for a cooking range in kitchen
counter. |
|
 |
|
| |
 |
|
 |
 |
|
|
| |
Carpentry |
|
| |
 |
|
|
 |
| |
 |
Providing aluminium French windows in living. |
 |
Providing wardrobes & shutters in kitchen
as per our standard specifications. |
Providing shutters for lofts as per our specifications. |
 |
Providing mirrors on wardrobe shutters or above
wash basins. |
 |
Providing showcases in living/dining. |
 |
Providing AC frames with grill and glass. |
 |
Fixing towel rods, towel rings and toilet cabinets. |
|
 |
|
 |
|
 |
 |
|
|
| |
Limitations of customising your Appartment |
|
| |
 |
|
 |
| |
| We regret that changes that affect
the elevation, structure, or plumbing systems of the building cannot
be carried out. Any changes that encroach into common areas and
setbacks of the building, or infringe Corporation rules and regulations
are also not feasible. |
| Requests for additional ceiling
points, fan points, or power points can be incorporated only if
such requests are received before casting the roof of the apartment,
since the necessary pipe lines have to be laid in the slab linking
the points to the Distribution Board. |
| Requests for the deletion of walls,
lofts and counters, or for the provision of wall outlets for plumbing
or electrical lines can be incorporated only if such requests are
received before the commencement of brickwork and plastering in
the apartment. |
| Changes in plumbing, electrical
and civil works cannot be accepted after plastering, since chipping
plastering, laying pipes and subsequent refinishing leaves unsightly
undulations on walls. However, at this stage, if flooring has not
been laid, extra T.V and telephone points at the skirting level
can be accepted. |
| The location of beams, or dropped
slabs, may reduce the internal height of lofts over doors and windows.
Lofts can be provided only if they have a minimum 30 cm internal
height, which permits plastering. |
| For ceramic tile flooring, we normally
offer a minimum of three choices. We can also indicate the required
quantities and provide a rebate if the client wishes to supply the
tiles. |
| We do not undertake marble flooring,
since it generates many problems regarding colour, grains, fissures
and stains. |
| The mosaic tile flooring is manufactured
in bulk and changes in tile chip design cannot be accepted. |
| European water closets cannot be
converted into Indian water closets. |
| We offer a standard paint colour
for interiors, which is designed to match the colours of doors and
windows, grills and common areas. These paints are mixed as a single
batch for a project. Alternate colours, if specified, may sometimes
not be available in the market, delaying a project. Paint colours
also tend to vary with each consignment making it difficult to match
colours for subsequent repairs and touching up. As such, we do not
accept a change from the standard colour. |
| We choose reliable makes of sanitary
ware and CP fittings for a project. Water, sewage and waste water
lines are laid to match the inlets and outlets of these makes of
sanitary ware and CP fittings, which are provided in the sample
flat. If we are intimated of your requirements before the plastering
stage, alternate makes and types of sanitary wares can be installed.
Changes are not accepted subsequently. The make of sanitary wares
provided in the sample flat can be provided in alternate colours.
Changes are not accepted for CP fittings, since such changes cause
alignment problems. |
| Frames with grills and glass for window air-conditioners can be
provided at any time, so long as the external appearance of the
building is not altered. |
|
|
 |
 |
 |
|
|
|
|
|
|